Before and After
Metal work and welding
Walk-Deck repair and coat with GACO walk-deck coating
This is a walk deck that was built incorrectly and rotting out. It had two layers of deck the original had been completely decked over with another layer of plywood and some type of urethane top coat. The wall drainage was blocked with the second layer and there was no ventilation. Both of these errors helped to rot the deck and that's pretty hard to do in Arizona. We removed the stucco center post that was built on top of the deck again that is incorrect and we replaced it with a full metal railing.